Skip to content

Features

Six modules. One set of jobs, cost codes and crews.

The bid becomes the budget. The foreman's report becomes job cost and the pay estimate. Closed jobs become the next bid's production history. Each module hands its numbers to the next, so nothing gets typed twice.

Command Center

Know which job is bleeding before your coffee is cold.

Backlog, projected profit, productivity, over/under billing and cash tied up in retention, on one screen. Under them, a short list of plain-English warnings ranked by dollars, each with the button that fixes it.

More about this module
workspro.agntc.io/app/dashboard

Bid engine

Bid from what your crews actually did, and what the low bidder actually charged.

Public work goes to the lowest responsive, responsible bidder. WorksPro puts your real hours per unit from closed jobs and the winning range from public bid tabs next to every item you price, so you stop guessing on the five items that decide the bid.

More about this module
B-214 · Hawthorne Blvd Signal UpgradesBids Oct 23 · 144 items
Winners' range Other bidders Your price
  • #14Signal standard foundations (8 EA)

    Winners $34k–$41k · You $148k

  • #222" PVC conduit, 1,850 LF

    Winners $52k–$63k · You $55k

  • #27Wire pull, conductors (LS)

    Winners $41k–$52k · You $49k

  • #31No. 5 pull boxes (22 EA)

    Winners $24k–$31k · You $27k

What-if markup · last 10 comparable bids

At 8% markup you would have been low on 6 of the last 10 comparable bids.

Sample data

Field app

The daily report your foreman will actually fill out.

Hours by person and cost code on a tap grid, quantities installed per bid item, equipment, weather, photos and the toolbox talk. Then sign and send. The target is under two minutes for a crew of four, and it keeps working with no signal.

More about this module

Job cost and WIP

See the fade at week six, not at closeout.

WorksPro compares what each job has earned with what it has spent, by cost code and cost type, every week. When a job starts to slide, the projected margin moves and you find out while there is still time to fix it.

More about this module
P-1042 · Broad Ave Signal & Lighting40% complete · PF 0.82

Bid margin

14.0%

Projected

10.9%

Fade

-3.1 pts

Budget spent by cost type · marker = % complete

Labor$119k / $205k|58%
Material$121k / $190k|63%
Equipment$34k / $60k|56%
Subcontract$40k / $85k|47%
Other$12k / $21k|58%

Man-hours: planned, earned, actual

Sample data

Pay estimates

Stop retyping quantities into the pay estimate.

Agencies pay by the quantity installed per bid item. WorksPro already has those quantities from approved daily reports, so the monthly estimate starts filled in, through the 20th, with retention and previous payments worked out.

More about this module
Pay estimate #4 · P-1042 Broad AvePeriod ending Oct 20
This period filled from 9 approved daily reports
Sample pay estimate lines
ItemThis periodAmount
62" interconnect conduit220$8,360
8Pull box (No. 5)4$2,880
11Signal standard foundation2$9,400
15LED luminaire, 135 W6$7,140
Work this period
$27,780
Retention (5%)
−$1,389
Amount due
$26,391
Agency format PDFG702 / G703

Sample data

Compliance

Certified payroll without the month-end scramble.

WorksPro keeps the wage determination with each job, the classification on every timecard, and the apprentice ratio on a gauge. When it is time to report, you export certified payroll from the same timecards the foreman already sent. You file it. WorksPro does not file for you.

More about this module
Compliance · P-1047 Pomona FiberElectrician, LA County
target 1:5

1 : 4.6

Apprentice ST hours, whole project

  • DAS-140 sent to apprenticeship committeesDone · Jul 7
  • Toolbox talk, Broad AveDue in 3 working days
  • CAC-2 training fund contributionsDue Nov 15
  • DIR contractor registration renewalDue Jun 30
Certified payroll · week ending Oct 16WH-347 PDFCSV

Sample data

Bring one bid and one live job. We will show you both in WorksPro.

30 minutes, on your own bid and one live job. No slides.