The daily report your foreman will actually fill out.

Hours by person and cost code on a tap grid, quantities installed per bid item, equipment, weather, photos and the toolbox talk. Then sign and send. The target is under two minutes for a crew of four, and it keeps working with no signal.

On every plan. Only the foreman needs a login.

What it does

  • 01

    Today's job, already open

    The foreman sees the project he is assigned to today and yesterday's report status. One button starts the report.

  • 02

    Hours on a tap grid

    Crew is prefilled from the schedule. Each person gets chips for the cost codes on this job and a 0.5-hour stepper. Hours past 8 roll to overtime, and the classification comes from the worker record.

  • 03

    Quantities against the contract

    Contract items with steppers and the quantity remaining, filtered to the cost codes this crew works. These quantities drive earned hours and the pay estimate.

  • 04

    Extra work, flagged the same day

    An "Extra work today?" toggle with a description starts a potential change order while the details are fresh.

  • 05

    Safety and photos

    Toolbox talk topic and attendees, plus photos resized on the phone before upload.

  • 06

    Works in a dead zone

    The draft saves on the phone after every tap. With no signal, the report queues and sends when the phone is back online.

  • 07

    The office approves

    Reports land in an approval queue. Approve, edit or send back with a note. Approval creates the timecards, quantities and labor cost.

  • 08

    Crew without logins are free

    Laborers and apprentices on the report are worker records, not users. Only the foreman needs a login.

In practice

3:30 PM, end of shift.

An example with sample numbers.

  1. 1

    The foreman taps Start daily report. His crew of four is already listed.

  2. 2

    Two taps per person put 8 hours on conduit and 2 on pull boxes. One apprentice is marked.

  3. 3

    He bumps 2-inch conduit by 120 LF and No. 5 pull boxes by 2, adds a photo and checks the toolbox talk.

  4. 4

    He signs with a finger and submits. In the office, approving it moves PF, budget burn and the next pay estimate.

Coming next

Planned for Phase 2.

WorksPro is in pilot. These are on the roadmap and not in the product today. AI features draft; a person confirms before anything is saved or sent.

  • Phase 2Voice entry: the foreman speaks the report and confirms the structured hours and quantities

Works with

Bring one bid and one live job. We will show you both in WorksPro.

30 minutes, on your own bid and one live job. No slides.